Why This Matters for Scheduling
Most of the anxiety around a commercial floor project isn't about the finished result — it's about not knowing how long the facility will actually be disrupted. Here's the real sequence, so you can plan staffing and operations around it instead of guessing.
Day 1: Assessment and Prep
The crew moves equipment and furnishings, masks off areas not being coated, and mechanically preps the slab — typically diamond grinding or shot blasting to open the concrete's pore structure for adhesion. This is also when we run moisture testing if it wasn't already done during the estimate. Dust is contained with vacuum-shrouded equipment; this isn't the open, uncontrolled dust cloud people picture.
Day 1–2: Repairs and Priming
Cracks, spalls, and control joints get filled or routed and sealed before anything else goes down — coating over an unrepaired crack just telegraphs it back through in a few months. A moisture-mitigating or standard primer coat follows, depending on what the testing showed.
Day 2–3: Base Coat and Broadcast
The base coat — typically 100% solids epoxy — goes down at a specified film thickness. If the system calls for slip-resistant texture (kitchens, ramps, wet areas) or decorative flake/quartz, it's broadcast into the wet base coat at this stage.
Day 3–4: Topcoat and Cure
Ask the independent provider to identify contaminants and exposure conditions, then explain preparation, product suitability, and any exclusions in the written scope.
Phasing for Facilities That Can't Fully Close
Most commercial projects are phased section by section — one warehouse aisle, one dealership bay, one kitchen zone — specifically so the whole facility isn't down at once. We build that phasing plan with you during the estimate based on your actual operating needs, not a generic template.
Frequently Asked Questions