tel
(317) 509-9873

Metallic Epoxy Floors

Dramatic, one-of-a-kind metallic epoxy systems for luxury garages, showrooms, and high-end residential spaces across Palm Beach Gardens, Jupiter, and West Palm Beach.

local projects
Projects Completed
Project examples available
Project examples
Written warranty terms
1–2
Day Installation

The Most Dramatic Floor Finish Available

Metallic epoxy creates a three-dimensional, flowing visual effect — no two floors look alike. Metallic mica pigments suspended in clear epoxy resin create depth, movement, and a high-gloss finish that reads like polished marble or liquid metal. These floors are the signature choice in Palm Beach Gardens's luxury custom homes and high-end garage spaces where a standard coating simply isn't enough.

Design Options

  • Single metallic color for a clean, uniform shimmer effect
  • Two-tone blends creating depth and gradient transitions
  • Marble effect using contrasting pigments and manipulation technique
  • Geode and lava flow patterns for dramatic, artistic results
  • Pearlescent finishes for soft, luminous elegance

Metallic Floor Cost in Florida

Most residential applications range from $8–$15 per square foot. A standard two-car garage typically runs $4,000–$7,500. Schedule a design consultation — we bring pigment samples to your estimate.

The Application Process

Metallic epoxy is hand-applied while the base coat is still wet. Our installers use specialized techniques — fans, torches, and squeegees — to move metallic pigments into flowing, three-dimensional patterns. No two floors ever come out the same, which is exactly the point.

The result is then sealed with a mirror-gloss polyurea topcoat that locks the pattern in permanently and protects it from UV fading, scratches, and stains.

Contractor applying gold metallic epoxy pigment swirls into wet base coat
FAQ

Questions Answered

Yes — extensive palette plus custom blends. We bring samples to your consultation.
Yes. Same 100% solids system and polyurea topcoat. The difference is only in the decorative layer.
Most residential installs take 2 days due to additional layers and curing time.
Yes, with appropriate moisture testing. Popular in finished basement bars, wine cellars, and home theaters.
Service Areas

Serving Greater West Palm Beach

Ready to Transform Your Floor?

Free on-site estimate. Same-day quote. Warranty terms supplied in writing included.

Get Free Estimate
Website Designed & Built By
Joe Design Group