It depends entirely on who installs it and how they prepare the surface. Not on the brand of epoxy. Not on how expensive the product is. On the preparation.
A properly installed 100% solids epoxy system over a diamond-ground, moisture-tested slab: 12–20 years in South Florida conditions before you'd consider a re-coat. A properly installed polyaspartic system with the same preparation: 18–25 years.
A water-based epoxy kit from the hardware store applied over an acid-etched or unprepared slab: 12–36 months before peeling starts. We've seen them fail in as little as one Florida year-round.
Free on-site estimate throughout Palm Beach Gardens, Jupiter, Wellington, Lake Worth Beach & West Palm Beach. Same-day quote. Warranty terms supplied in writing on every installation.
Get Your Free Estimate
